Dry Creek Habitat Phase II

The Dry Creek Habitat Enhancement Phase II project consists of construction of habitat modifications within the Dry Creek Valley along approximately 0.75 miles of Dry Creek outside the limits of the City of Healdsburg, CA 95448. The work includes, excavating backwater alcoves and side channels into the floodplain areas of Dry Creek, installation of habitat and stabilization structures composed of logs and boulders, driving logs into the ground to stabilize log structures, stabilization of banks, planting and replanting riparian vegetation and trees, removal of nuisance non-native riparian vegetation, construction of in-channel features such as boulder fields and riffles, dewatering during construction, and isolation of work areas from the creek. This project is to be constructed in the 2016-2017 seasons.